Changes for page LX5V-2PT2DAI
Last modified by WeconTurkey on 2024/10/16 22:58
From version 16.1
edited by WeconTurkey
on 2024/10/16 22:58
on 2024/10/16 22:58
Change comment:
There is no comment for this version
Summary
-
Page properties (2 modified, 0 added, 0 removed)
Details
- Page properties
-
- Author
-
... ... @@ -1,1 +1,1 @@ 1 -XWiki. WeconTurkey1 +XWiki.Jim - Content
-
... ... @@ -1,13 +1,13 @@ 1 1 = **1. Installation** = 2 2 3 -* Before installation, it must be ensured that the PLC host and the related device of the BD moduleterminal wiring are powered off reliably. The module shell is inserted into the BD module slot of PLC host, and then locked with two standard screws for fixation.4 -* Two standard terminal heads are equipped with this B Dmodule. After connecting the wiring, insert them into its terminal. After confirming that the host, BDmodule, wiring, etc. are installed correctly, it can be powered on for use.3 +* Before installation, it must be ensured that the PLC host and the related device of the BD board terminal wiring are powered off reliably. The module shell is inserted into the BD module slot of PLC host, and then locked with two standard screws for fixation. 4 +* Two standard terminal heads are equipped with this Bd board. After connecting the wiring, insert them into its terminal. After confirming that the host, BD board, wiring, etc. are installed correctly, it can be powered on for use. 5 5 * **✎Note:** 6 6 ** When DAI current is output, ensure that the external load resistance is less than 500Ω. If the external load resistance is greater than 500Ω, the output current will be lower than normal value. 7 -** Please install the BD modulefirmly and fix it on PLC. Poor contact may lead to failure.8 -** Tightening torque for fixing BD moduleor PLC top cover is 0.3N.m to0.6N.m. Please tighten it firmly to avoid malfunction.7 +** Please install the BD board firmly and fix it on PLC. Poor contact may lead to failure. 8 +** Tightening torque for fixing BD board or PLC top cover is 0.3N.m to0.6N.m. Please tighten it firmly to avoid malfunction. 9 9 ** You can only use a LX5V-2PT2DAI-BD on the PLC main unit of LX5 series. 10 -* **Warning: Cut off the power before installing, removing or wiring the BD moduleto avoid electric shock or product damage.**10 +* **Warning: Cut off the power before installing, removing or wiring the BD board to avoid electric shock or product damage.** 11 11 12 12 = **2. Appearance and terminal** = 13 13 ... ... @@ -120,11 +120,11 @@ 120 120 1. 3-wire PT100: When using channel 1, two leads of the same color are connected to L1- and VI- respectively, and the other lead of different color is connected to L1+. Channel 2 is connected in the same way. 121 121 122 122 |[[image:image-20221222110545-3.png]] 123 -|Cut off the power before installing, removing or wiring the BD moduleto avoid electric shock or product damage.123 +|Cut off the power before installing, removing or wiring the BD board to avoid electric shock or product damage. 124 124 125 125 **✎Note:** 126 126 127 -* 127 +* 128 128 ** Do not place signal cables near high voltage power cables or in the same trunk line. Otherwise, it may be disturbed or surged. Keep a safe distance between signal cable and power cable, at least 100mm. 129 129 ** Ground the shielding of shielded wire or shielded cable. But the ground point and high voltage line cannot be the same. 130 130 ** Do not connect cables of impermissible size to avoid poor contact or product damage. ... ... @@ -165,11 +165,11 @@ 165 165 166 166 = **5. Description of PLC device** = 167 167 168 -~1. When connected to LX3 series PLC, please refer to LX3 series BD modulemanual.168 +~1. When connected to LX3 series PLC, please refer to LX3 series BD board manual. 169 169 170 -2. When connected to LX5 series PLC, if the firmware version of PLC is lower than 2.051 (excluding 2.051), or BD moduleis not configured by host computer, it can be controlled by the following system devices:170 +2. When connected to LX5 series PLC, if the firmware version of PLC is lower than 2.051 (excluding 2.051), or BD board is not configured by host computer, it can be controlled by the following system devices: 171 171 172 -3. User can select device through I/O mapping to use the configuration function of new BD module. For details, please refer to "[[6.1 Parameter configuration>>path:#_6.1 参数配置]]".172 +3. User can select device through I/O mapping to use the configuration function of new BD board. For details, please refer to "[[6.1 Parameter configuration>>path:#_6.1 参数配置]]". 173 173 174 174 **Device allocation** 175 175 ... ... @@ -203,16 +203,16 @@ 203 203 204 204 === **6.1 Parameter configuration** === 205 205 206 -① Open the host computer software and create a new project, in “Project Manager” → “Extended Function” , double-click "BD ModuleConfiguration" **^^Note^^**to enter “BD settings” interface;206 +① Open the host computer software and create a new project, in “Project Manager” → “Extended Function” , double-click "BD Board Configuration" **^^Note^^**to enter “BD settings” interface; 207 207 208 -② Configure the currently connected PLC (take the LX5V-2416 model as an example) and BD board model on the BD moduleconfiguration interface: Select “LX5V-2PTWDAI" in the device bar on the right side of the BDmoduleconfiguration interface and double-click to add it to the corresponding slot position of PLC (slot number 1 or 2, the software will select slot 1 by default, and right-click to move down to slot 2);208 +② Configure the currently connected PLC (take the LX5V-2416 model as an example) and BD board model on the BD board configuration interface: Select “LX5V-2PTWDAI" in the device bar on the right side of the BD board configuration interface and double-click to add it to the corresponding slot position of PLC (slot number 1 or 2, the software will select slot 1 by default, and right-click to move down to slot 2); 209 209 210 -③ After adding the BD moduleto the slot, double-click or right-click to select configuration parameters to enter LX5V-2PT2DAI-BD configuration parameters interface, as shown in the following figure. Configure related parameters on this interface.210 +③ After adding the BD board to the slot, double-click or right-click to select configuration parameters to enter LX5V-2PT2DAI-BD configuration parameters interface, as shown in the following figure. Configure related parameters on this interface. 211 211 212 212 [[image:image-20221222111948-1.png]] 213 213 214 214 215 -**Note: This function is only supported in the following versions of host computer, slave computer and BD module:**215 +**Note: This function is only supported in the following versions of host computer, slave computer and BD board:** 216 216 217 217 (1) Supported host computer software versions: Wecon PLC Editor2 2.1.204 and above, as shown in the following figure: 218 218 ... ... @@ -222,13 +222,13 @@ 222 222 223 223 [[image:image-20221222112424-2.png]] 224 224 225 -(3) Supported BD moduleversion number: 1013 and above, as shown in the following figure:225 +(3) Supported BD board version number: 1013 and above, as shown in the following figure: 226 226 227 227 [[image:image-20221222112455-3.png]] 228 228 229 229 **The parameter configuration interface is as follows:** 230 230 231 -~1. Module setting: Set response time (The response time is the interval time between PLC acquisition of BD moduledata. Range: 0.1ms to 3276.7ms).231 +~1. Module setting: Set response time (The response time is the interval time between PLC acquisition of BD board data. Range: 0.1ms to 3276.7ms). 232 232 233 233 [[image:image-20221222112604-4.png]] 234 234 ... ... @@ -236,7 +236,7 @@ 236 236 237 237 [[image:image-20221222112628-5.png]] 238 238 239 -* Check enable channel to set whether to enable the current BD modulechannel.239 +* Check enable channel to set whether to enable the current BD board channel. 240 240 * Sensor type: PT100 by default. 241 241 * Setting the filtering intensity can reduce the jitter of BD channel value. The default configuration of filter intensity is 4. Level 0 is the lowest and level 9 is the highest. The filter intensity can be adjusted according to actual use. 242 242 * Check enable overrun detection to judge that when the upper and lower limits of temperature exceed the current setting temperature, the host computer will prompt an error. ... ... @@ -260,15 +260,15 @@ 260 260 [[image:image-20221222112945-8.png]] 261 261 262 262 263 -* Check enable channel to set whether to enable the current BD modulechannel.263 +* Check enable channel to set whether to enable the current BD board channel. 264 264 * The conversion mode is set to DAI conversion mode by default, and the measurement range is 4mA~~20mA (0~~2000). 265 -* Output state after stop: When PLC stops, the output state of BD modulechannel mainly includes the following three types:265 +* Output state after stop: When PLC stops, the output state of BD board channel mainly includes the following three types: 266 266 267 267 Output clear: When PLC stops, the output current of BD board channel is 4mA 268 268 269 -Output hold: When PLC stops, the channel output of the BD modulemaintains the digital current value set by the corresponding channel in the current I/O mapping device.269 +Output hold: When PLC stops, the channel output of the BD board maintains the digital current value set by the corresponding channel in the current I/O mapping device. 270 270 271 -Output preset value: When PLC stops, BD modulechannel outputs preset digital value or preset analog quantity corresponding to the current value.271 +Output preset value: When PLC stops, BD board channel outputs preset digital value or preset analog quantity corresponding to the current value. 272 272 273 273 * Check enable calibration, you could calculate the gain offset according to the following formula to convert the corresponding channel value: 274 274 ... ... @@ -276,14 +276,14 @@ 276 276 277 277 * When the channel value deviates, you could also set the gain offset to calibrate the channel. For example: 278 278 279 -* When the channel input digital value is 0, the multimeter measures the output current of BD modulechannel to be 5mA (corresponding digital value is 125).280 -* When the channel input digital value is 2000, the multimeter measures the output current of BD modulechannel to be 5mA (corresponding digital value is 1875).279 +* When the channel input digital value is 0, the multimeter measures the output current of BD board channel to be 5mA (corresponding digital value is 125). 280 +* When the channel input digital value is 2000, the multimeter measures the output current of BD board channel to be 5mA (corresponding digital value is 1875). 281 281 282 282 Suppose the gain is a, and the offset is b, then[[image:image-20221222113055-9.png]] 283 283 284 284 Solve and get[[image:image-20221222113102-10.png]]The calibration can be completed by setting the corresponding gain offset to the current channel. 285 285 286 -4. Set I/O mapping. The channels are mapped to R device according to the current number of BD modulechannels by default. As shown in the following figure, BDmoduleCH1 to CH4 is mapped to device R0 to R3.286 +4. Set I/O mapping. The channels are mapped to R device according to the current number of BD board channels by default. As shown in the following figure, BD board CH1 to CH4 is mapped to device R0 to R3. 287 287 288 288 [[image:image-20221222113140-11.png]] 289 289 ... ... @@ -294,19 +294,19 @@ 294 294 === **6.2 Ladder Diagram** === 295 295 296 296 297 -~1. Programming example that does not use the host computer software "BD moduleconfiguration" function. For device allocation, please refer to "5 PLC device description".297 +~1. Programming example that does not use the host computer software "BD board configuration" function. For device allocation, please refer to "[[5 PLC device description>>path:#_PLC软元件说明]]". 298 298 299 299 [[image:image-20221222113654-15.png]] 300 300 301 -2. Programming example using "BD moduleconfiguration" function of host computer software:301 +2. Programming example using "BD board configuration" function of host computer software: 302 302 303 303 === **6.3 BD monitoring interface and buffer memory** === 304 304 305 -Open the module monitoring interface, select BD module, select LX5V-2PT2DAI from the list of BD modules on the right to monitor it online, and check the current BDmodulecommunication status and error information in time.305 +Open the module monitoring interface, select BD board module, select LX5V-2PT2DAI from the list of BD boards on the right to monitor it online, and check the current BD board communication status and error information in time. 306 306 307 307 [[image:image-20221222113854-17.png]] 308 308 309 -① PT buffer memory (BFM): used for BD modulestatus monitoring.309 +① PT buffer memory (BFM): used for BD board status monitoring. 310 310 311 311 (% class="table-bordered" %) 312 312 |((( ... ... @@ -335,7 +335,7 @@ 335 335 ))) 336 336 |0x2184|×|R|Channel 2 error code|0|0 to 1|0: No error; 1: Channel value exceeds the range 337 337 338 -② DAI buffer memory (BFM): used for BD modulestatus monitoring.338 +② DAI buffer memory (BFM): used for BD board status monitoring. 339 339 340 340 (% class="table-bordered" %) 341 341 |((( ... ... @@ -374,7 +374,7 @@ 374 374 ))) 375 375 |0x2384|×|R|Channel 4 error code|0|0 to 1|0: No error; 1: Channel value exceeds the range 376 376 377 -③ Universal buffer memory (BFM): used to diagnose the communication status of the currently connected BD module.377 +③ Universal buffer memory (BFM): used to diagnose the communication status of the currently connected BD board. 378 378 379 379 (% class="table-bordered" %) 380 380 |((( ... ... @@ -400,6 +400,6 @@ 400 400 |0x218|×|R|Number of valid bytes sent|0|0 to 0xFFFFFFFF|Number of valid bytes sent 401 401 |0x21C|×|R|Number of bytes received|0|0 to 0xFFFFFFFF|Number of bytes received 402 402 |0x220|×|R|Number of valid bytes received|0|0 to 0xFFFFFFFF|Number of valid bytes received 403 -|0x224|×|R|Communication time (unit s)|0|0 to 0xFFFFFFFF|Normal communication time since the BD moduleis powered on403 +|0x224|×|R|Communication time (unit s)|0|0 to 0xFFFFFFFF|Normal communication time since the BD board is powered on 404 404 405 405