Changes for page LX5V-2PT2DAI
Last modified by WeconTurkey on 2024/10/16 22:58
Summary
-
Page properties (2 modified, 0 added, 0 removed)
Details
- Page properties
-
- Author
-
... ... @@ -1,1 +1,1 @@ 1 -XWiki. Jim1 +XWiki.Karen - Content
-
... ... @@ -1,13 +1,13 @@ 1 1 = **1. Installation** = 2 2 3 -* Before installation, it must be ensured that the PLC host and the related device of the BD board4 -* Two standard terminal heads are equipped with this B dboard. After connecting the wiring, insert them into its terminal. After confirming that the host, BDboard, wiring, etc. are installed correctly, it can be powered on for use.3 +* Before installation, it must be ensured that the PLC host and the related device of the BD module terminal wiring are powered off reliably. The module shell is inserted into the BD module slot of PLC host, and then locked with two standard screws for fixation. 4 +* Two standard terminal heads are equipped with this BD module. After connecting the wiring, insert them into its terminal. After confirming that the host, BD module, wiring, etc. are installed correctly, it can be powered on for use. 5 5 * **✎Note:** 6 6 ** When DAI current is output, ensure that the external load resistance is less than 500Ω. If the external load resistance is greater than 500Ω, the output current will be lower than normal value. 7 -** Please install the BD board firmly and fix it on PLC. Poor contact may lead to failure.8 -** Tightening torque for fixing BD board or PLC top cover is 0.3N.m to0.6N.m. Please tighten it firmly to avoid malfunction.7 +** Please install the BD module firmly and fix it on PLC. Poor contact may lead to failure. 8 +** Tightening torque for fixing BD module or PLC top cover is 0.3N.m to0.6N.m. Please tighten it firmly to avoid malfunction. 9 9 ** You can only use a LX5V-2PT2DAI-BD on the PLC main unit of LX5 series. 10 -* **Warning: Cut off the power before installing, removing or wiring the BD board to avoid electric shock or product damage.**10 +* **Warning: Cut off the power before installing, removing or wiring the BD module to avoid electric shock or product damage.** 11 11 12 12 = **2. Appearance and terminal** = 13 13 ... ... @@ -120,7 +120,7 @@ 120 120 1. 3-wire PT100: When using channel 1, two leads of the same color are connected to L1- and VI- respectively, and the other lead of different color is connected to L1+. Channel 2 is connected in the same way. 121 121 122 122 |[[image:image-20221222110545-3.png]] 123 -|Cut off the power before installing, removing or wiring the BD board to avoid electric shock or product damage.123 +|Cut off the power before installing, removing or wiring the BD module to avoid electric shock or product damage. 124 124 125 125 **✎Note:** 126 126 ... ... @@ -294,7 +294,7 @@ 294 294 === **6.2 Ladder Diagram** === 295 295 296 296 297 -~1. Programming example that does not use the host computer software "BD board configuration" function. For device allocation, please refer to " [[5 PLC device description>>path:#_PLC软元件说明]]".297 +~1. Programming example that does not use the host computer software "BD board configuration" function. For device allocation, please refer to "5 PLC device description". 298 298 299 299 [[image:image-20221222113654-15.png]] 300 300