Changes for page 01 Program execution
Last modified by Leo Wei on 2024/12/24 22:42
Summary
-
Page properties (2 modified, 0 added, 0 removed)
Details
- Page properties
-
- Author
-
... ... @@ -1,1 +1,1 @@ 1 -XWiki. Jim1 +XWiki.Mora - Content
-
... ... @@ -29,8 +29,8 @@ 29 29 ((( 30 30 **✎Note:** 31 31 32 -* To prevent the temperature from rising, do not install at the bottom, top or vertical direction.Be sure to install it horizontally on the wall as shown on the right. 33 -* Please leave a space of more than 50mm between the host and other equipment or structures.Try to avoid high-voltage lines, high-voltage equipment, and power equipment. 32 +* To prevent the temperature from rising, do not install at the bottom, top or vertical direction. Be sure to install it horizontally on the wall as shown on the right. 33 +* Please leave a space of more than 50mm between the host and other equipment or structures. Try to avoid high-voltage lines, high-voltage equipment, and power equipment. 34 34 ))) 35 35 36 36 == Wiring ==