Changes for page 01 Program execution

Last modified by Jiahao Lai on 2025/07/18 17:39

From version 31.1
edited by Mora Zhou
on 2023/11/22 14:04
Change comment: There is no comment for this version
To version 20.1
edited by Stone Wu
on 2022/09/23 16:38
Change comment: There is no comment for this version

Summary

Details

Page properties
Author
... ... @@ -1,1 +1,1 @@
1 -XWiki.Mora
1 +XWiki.Stone
Content
... ... @@ -1,6 +1,6 @@
1 1  = **Summary** =
2 2  
3 -This manual has a comprehensive introduction to the basic functions of WECON PLC Editor and the actual use. This book is completely aimed at zero-based readers, which is an essential reference book for entry-level readers to quickly and fully grasp WECON PLC and WECON PLC Editor.
3 +This manual has a comprehensive introduction to the basic functions of WECON PLC Editor and the actual use. This book is completely aimed at zero-based readers, is an essential reference book for entry-level readers to quickly and fully grasp WECON PLC and WECON PLC Editor.
4 4  
5 5  This book starts from the basic product of WECON PLC and the basic concept and operation of WECON PLC Editor. It combines with a large number of cases and graphic analysis to comprehensively and deeply explain the use of WECON PLC Editor Software, as well as PLC program.
6 6  
... ... @@ -29,8 +29,8 @@
29 29  (((
30 30  **✎Note:**
31 31  
32 -* To prevent the temperature from rising, do not install at the bottom, top or vertical direction. Be sure to install it horizontally on the wall as shown on the right.
33 -* Please leave a space of more than 50mm between the host and other equipment or structures. Try to avoid high-voltage lines, high-voltage equipment, and power equipment.
32 +* To prevent the temperature from rising, do not install at the bottom, top or vertical direction.Be sure to install it horizontally on the wall as shown on the right.
33 +* Please leave a space of more than 50mm between the host and other equipment or structures.Try to avoid high-voltage lines, high-voltage equipment, and power equipment.
34 34  )))
35 35  
36 36  == Wiring ==
... ... @@ -131,7 +131,7 @@
131 131  The initialization based on the status of the CPU module is as follows.
132 132  
133 133  * **√**: execute
134 -* **×**: not execute
134 +* **×**: not execute
135 135  
136 136  (% class="table-bordered" %)
137 137  |=(% rowspan="2" %)**Processing item**|=(% colspan="3" %)**Status of the CPU module**
... ... @@ -247,7 +247,7 @@
247 247  *1: Scan program paging: multiple scan programs are established, and each scan program is called a paging. After scan program A is executed, before scan program B is executed, it will be judged whether an event program needs to be executed.
248 248  
249 249  (% style="text-align:center" %)
250 -[[image:image-20220926104203-1.jpeg||class="img-thumbnail"]]
250 +[[image:1652247397997-492.png||class="img-thumbnail"]]
251 251  
252 252  When it is the turn of the execution sequence of event execution type program C and Y50 is ON, the program is executed.
253 253  
image-20220926104203-1.jpeg
Author
... ... @@ -1,1 +1,0 @@
1 -XWiki.Stone
Size
... ... @@ -1,1 +1,0 @@
1 -105.7 KB
Content