Wiki source code of R Series

Version 59.3 by Joe on 2024/11/29 14:42

Show last authors
1 == **1 Product description** ==
2
3 |**Series**|(% style="width:132px" %)**Model**|(% style="width:552px" %)**Description**
4 |(% rowspan="3" %)**R Series**|(% style="width:132px" %)RE-00|(% style="width:552px" %)1 network port, single serial port
5 |(% style="width:132px" %)RE-4G|(% style="width:552px" %)1 network port, single serial port, support 4G.
6 |(% style="width:132px" %)RH-WF|(% style="width:552px" %)(((
7 2 network ports, 1 HDMI interface, single serial port, 2 RS485 terminals, support WiFi
8
9 2 optocoupler isolated input (DI), 2 relay output (DO)
10 )))
11
12 === **1.1 Product appearance** ===
13
14 ==== **RE-00/RE-4G** ====
15
16 [[image:1723447082795-273.png]]
17
18 RE-00/RE-4G Appearance
19
20 [[image:1723447096815-592.png]]
21
22 RE-00/RE-4G Installation Dimensions
23
24 ==== **RH-WF** ====
25
26 [[image:Wecon V-BOX R Series User Manual 240611 V1.2_2faa2eeb.gif||alt="Shape1" height="316" width="464"]]
27
28 (((
29 **WiFi antenna**
30 )))
31
32 RH-WF
33
34 [[image:Wecon V-BOX R Series User Manual 240611 V1.2_99c3a18c.png||height="259" width="638"]]
35
36 Installation size
37
38
39 === **1.2 Product specifications** ===
40
41 (((
42 (% style="width:815px" %)
43 |=(% colspan="3" %)**Model/Specifications**|=**RE-00**|=**RE-4G**|=**RH-WF**
44 |(% colspan="3" %)**Item**|(% colspan="3" %)**Parameters**
45 |(% colspan="3" %)CPU|(% colspan="2" %)Cortex-A35 4-Core 1.2GHz|Cortex A55 4-Core 1.8GHz
46 |(% rowspan="3" %)Memory|(% colspan="2" %)Flash|(% colspan="2" %)128MB|8GB
47 |(% colspan="2" %)RAM|(% colspan="2" %)DDRII 64MB|2GB
48 |(% colspan="2" %)SD Card|(% colspan="2" %)N/A|TF card
49 |(% rowspan="8" %)(((
50 I/O
51
52 Interface
53 )))|(% colspan="2" %)USB HOST|(% colspan="2" %)1, no isolation|(((
54 USB 2.0*1 No isolation
55
56 USB 3.0*1 No isolation
57 )))
58 |(% colspan="2" %)USB DEVICE|(% colspan="2" %)1, no isolation|Type-C*1
59 |(% colspan="2" %)Serial port|(% colspan="2" %)COM1: RS232, RS422/RS485|(((
60 COM1: RS232, RS422/RS485 (2 in 1)
61
62 1 expansion serial port (terminal line)
63
64 [COM2: RS485]
65 )))
66 |(% colspan="2" %)Ethernet port|(% colspan="2" %)1|10/100M Interface*2
67 |(% colspan="2" %)WIFI module|(% colspan="2" %)N/A|Yes
68 |(% colspan="2" %)4G module|N/A|4G|N/A
69 |(% colspan="2" %)HDMI|(% colspan="2" %)N/A|HDMI 2.0*1
70 |(% colspan="2" %)I/O|(% colspan="2" %)N/A|2-channel relay output, 2-channel isolated input with optocoupler
71 |(% rowspan="2" %)Power supply|(% colspan="2" %)Input power supply|(% colspan="3" %)24V DC (12-28V DC)
72 |(% colspan="2" %)Power consumption|(% colspan="3" %)<10W
73 |(% rowspan="4" %)Specifications|(% colspan="2" %)Shell material|(% colspan="2" %)Cold rolled sheet|Engineering-plastics PC+AB5 (Flame retardant level)
74 |(% colspan="2" %)Dimensions (W*H*D)|(% colspan="2" %)101.0*73.2*26.8mm|125.0*93.7*51.0 mm
75 |(% colspan="2" %)Wall mounting hole dimensions|(% colspan="2" %)110.0*15.6 mm|/(Fastener mounting)
76 |(% colspan="2" %)Weight|(% colspan="2" %)0.26Kg|253g
77 |(% rowspan="4" %)(((
78 Operation
79
80 Environment
81 )))|(% colspan="2" %)Vibration resistance|(% colspan="3" %)Compile with IEC61131-2 standard
82 |(% colspan="2" %)Storage temperature|(% colspan="3" %)-20℃-70℃
83 |(% colspan="2" %)Working temperature|(% colspan="3" %)-10℃-60℃
84 |(% colspan="2" %)Ambient humidity|(% colspan="3" %)10-90% RH (No condensation)
85 |(% colspan="3" %)CE certification|(% colspan="3" %)Yes
86 |(% colspan="3" %)FCC certification|(% colspan="3" %)FCC Class A Certification
87 |(% colspan="2" %)Positioning function|(% colspan="2" %)N/A|Base station positioning|N/A
88 |(% rowspan="7" %)(((
89 Software
90
91 function
92 )))|(% colspan="2" rowspan="4" %)(((
93 Internet of Things Services
94
95 (Optional)
96 )))|(% colspan="2" %)100 real-time data tags|300 real-time data tags
97 |(% colspan="2" %)20 alarm data tags|200 alarm data tags
98 |(% colspan="2" %)50 historical data tags|100 historical data tags
99 |(% colspan="3" %)Days of historical data saved: 60 days/1 million
100 |(% colspan="2" %)Pass through|(% colspan="3" %)Yes
101 |(% colspan="2" %)VPN Pass trough|(% colspan="3" %)Yes
102 |(% colspan="2" %)API interface|(% colspan="3" %)Yes
103
104 === **1.3 Interface Description** ===
105 )))
106
107 ==== **Appearance component description** ====
108
109 **RE-00/RE-4G**
110
111 [[image:1723448311561-814.png]]
112
113 RE-00/RE-4G Component Description
114
115
116 |**1**|Indicator lamp|**2**|Micro-USB|**3**|Ethernet port|**4**|COM port
117 |**5**|Power supply|**6**|4G antenna (Optional)|**7**|Fixed fastener|**8**|SIM card (Optional)
118
119 **RH-WF**
120
121 [[image:1723448356737-113.png]]
122
123 RH-WF Component Description
124
125 |**1**|Indicator lamp|**2**|USB-A|**3**|Network Port 1|**4**|Network Port 2
126 |**5**|HDMI|**6**|TYPE-C|**7**|COM port|**8**|I/O interface and RS485 terminal
127 |**9**|Power supply|**10**|WIFI antenna|**11**|Fixed fastener| |
128
129 ==== **Interface Description** ====
130
131 **RE-00/RE-4G**
132
133 [[image:Wecon V-BOX R Series User Manual 240611 V1.2_d215ad34.png||height="276" width="616"]]
134
135
136 **RH-WF**
137
138 [[image:Wecon V-BOX R Series User Manual 240611 V1.2_d48f58ee.png||height="240" width="488"]]
139
140 ==== **Interface Definition** ====
141
142 **RE-00/RE-4G COM1 interface definition**
143
144 |**Pin**|**Definition**|**Pin**|**Definition**
145 |1|RS422 TX+/RS485 A+|2|RS232 RXD
146 |3|RS232 TXD|5|GND
147 |6|RS422 TX-/RS485 B-|8|RS422 RX-
148 |9|RS422 RX+| |
149
150 **RH-WF**
151
152 |(% colspan="2" %)**Pin**|**Definition**
153 |(% rowspan="7" %)[[image:Wecon V-BOX R Series User Manual 240611 V1.2_ef6a7104.gif||height="205" width="93"]]|S/S|(((
154 Input mode selection terminal.
155
156 Connecting to 24V+ indicates that it supports** NPN** input;
157
158 Connecting to 24V- indicates that it supports **PNP** input.
159 )))
160 |Xn|Switch quantity input terminal
161 |Yn|Switch quantity signal output terminal, relay output
162 |COM|Output common port
163 |485+|RS485+
164 |485-|RS485-
165 |GND|Ground
166
167 == **2 Applications** ==
168
169 === Basic application ===
170
171 R series products, which can easily realize advanced requirements such as real-time display on industrial sites.
172
173 [[image:Wecon V-BOX R Series User Manual 240611 V1.2_ab54a2bc.png||height="304" width="631"]]
174
175 ① Large-screen display, connect computer/TV Display the project screen;
176
177 ② Network port device, connect to network device such as slave computers, and download projects online through configuration software;
178
179 ③ Serial port device, connect to the serial port device of the slave computer, and the project can also be downloaded online through the configuration software.
180
181
182 === RH-WF and WS21 ===
183
184 RH-WF supports local HDMI interface to connect to in-site screen like a TV screen to display the project. WS21, a touching screen, can be connected with RH-WF via HDMI interface.
185
186 (% style="text-align:center" %)
187 [[image:图片1.png]]
188
189 (% style="text-align:center" %)
190 [[image:图片2.png]]
191
192 HDMI Port is for displaying the project. And USB Port is for touching.
193
194
195
196 == **3 Operation Instructions** ==
197
198 === **3.1 Project Download-PIStudio** ===
199
200 **(1) New project**
201
202 PIStudio→[Home]→[New Project]→[Project Properties], and set the project name and [HMI model] in step by step: RE, RH series, select the detailed HMI model → [Screen style]: use the default do not set→[Done].
203
204 [[image:Wecon V-BOX R Series User Manual 240611 V1.2_8971673d.png||height="340" width="638"]]
205
206 **(2) Enable cloud server**
207
208 **Configuration of V-NET IoT System**
209
210 **It needs to check "Enable Cloud" function in order to view "Remote Monitoring" screen in V-NET, and configure the functions of tags, data recording on the cloud, and alarm recording on the cloud.**
211
212 Upload to the cloud: All configured tag information, historical information, and alarm information will be pushed to V-NET.
213
214
215 [[image:Wecon V-BOX R Series User Manual 240611 V1.2_19762229.png||height="360" width="638"]]
216
217 **(3) Project compile/download**
218
219 After the project is completed, click **[Project Compile]**→After prompting that the compilation is completed, click** [Download Project]**→device detected, **[PC port]**. Ethernet or USB download→[PC→HMI]→pop up a prompt, click **[OK]** → complete the configuration project download, it will take effect after restart.
220
221 [[image:Wecon V-BOX R Series User Manual 240611 V1.2_38834748.png||height="340" width="634"]]
222
223 [[image:Wecon V-BOX R Series User Manual 240611 V1.2_31fafd4e.png||height="287" width="348"]]
224
225 **Note: “Flash light" in the picture is the flashing light of the detection device; "Test network" in the figure refers to the network status of the test device.**
226
227 === **3.2 Check V-NET IoT System** ===
228
229 ==== **3.2.1 V-NET login** ====
230
231 (1) New users must register first, and after the registration is successful, the user can use it.
232
233 ● A successfully registered account is an administrator account, which can bind the device and support other operations.
234
235 ● Users need to remember the registered account and password, and can log in simultaneously on the PC/APP.
236
237 [[image:Wecon V-BOX R Series User Manual 240611 V1.2_7103ee91.png||height="274" width="453"]]
238
239 (2) Enter the account and password, and then click the **[Log in] **button.
240
241 (3) After admin account logs in to the platform, it will jump to the homepage by default, as shown in the figure below.
242
243 [[image:Wecon V-BOX R Series User Manual 240611 V1.2_59ff7f12.png||height="357" width="598"]]
244
245 ==== **3.2.2 Adding devices** ====
246
247 (1) After successfully logging in, enter the** [Device Management]** interface, and add the device information to be accessed through the “+” button in the bar.
248
249 [[image:Wecon V-BOX R Series User Manual 240611 V1.2_45c9855a.png||height="409" width="638"]]
250
251 (2) After the **[Add Device]** window pops up, enter the device machine code and password, etc., and add the device. Other instructions are as follows:   
252
253 ① **Device machine code:** Each device has a unique and independent machine code for remote monitoring device identification.     
254
255 Obtain machine code:
256
257 ● HMI PIStudio-**[Tool]**-**[Download project]**-Machine code.
258
259 ● Scan the QR code of the device to obtain the machine code.
260
261 ② **Device password:** Refers to the cloud access password, the default is 888888. The initial binding device password: see [[Cloud Configuration>>path:mk:@MSITStore:E:%5C%5CA%E6%97%A5%E5%B8%B8%E5%B7%A5%E4%BD%9C%E6%96%87%E4%BB%B6%5C%5C2023-06-15PI%E5%B8%AE%E5%8A%A9%E6%89%8B%E5%86%8C%5C%5C%E4%B8%AD%E6%80%A7%E7%89%8820231016%EF%BC%88%E6%A0%87%E5%87%86%EF%BC%89%5C%5Chelp20231020.chm::/levi%E2%85%A1/5/5.9.htm]].
262
263 ③ **Device alias:** Refers to the name recognition of the device in the menu bar of V-NET.
264
265 (3) Binding device is successful, click OK, prompt: Bind device successful!
266
267 ==== **3.2.3 V-NET check** ====
268
269 **(1) Remote monitoring**
270
271 The remote monitoring module can display the current screen in real time, and realize the operation of the project on the web page, realize the remote monitoring of the device and the control of the screen.
272
273 [[image:Wecon V-BOX R Series User Manual 240611 V1.2_a262a004.png||height="362" width="638"]]
274
275 **(2) Data viewing**
276
277 Data view has six modules, including Communication port, Collection point, Alarm configuration, Alarm record, Historical configuration, Historical data record.
278
279 [[image:Wecon V-BOX R Series User Manual 240611 V1.2_6ce8af63.png||height="357" width="638"]]
280
281 **The specific parameter is as follows:**
282
283 ① **Communication port:** The communication port information, connection mode and protocol name configured on HMI. It can only be viewed, and cannot be added or modified. The information comes from what is set on HMI.
284
285 ② **Collection point**: Data monitoring module. The collection point is the tag, and its read-write, write-only, and read-only permissions also come from the tags set in PIStudio. (**Note: Tags cannot be added or removed here.**)
286
287 ③ **Alarm message:** For the alarm record of the device, tags cannot be added. Operations such as confirming the alarm record and exporting data can be performed.
288
289 ④ **Historical information:** The historical data of the device cannot add tag, supports curve and list viewing, and supports export historical data and other operations.
290
291 **(3) Cloud configuration**
292
293 The cloud SCADA platform is mainly used to display the monitoring/operation interface of the bound device in the V-NET.
294
295 [[image:Wecon V-BOX R Series User Manual 240611 V1.2_8ecdd915.png||height="332" width="638"]]
296
297 The main functions of Cloud SCADA interface in device management are as follows:
298
299 [[image:Wecon V-BOX R Series User Manual 240611 V1.2_3c59fa4c.png||height="21" width="19"]] Refresh the current Cloud SCADA project.
300
301 [[image:Wecon V-BOX R Series User Manual 240611 V1.2_56dc36ee.png||height="20" width="19"]] Browse the current Cloud SCADA project in full screen (Press “Esc” exit).
302
303 [[image:Wecon V-BOX R Series User Manual 240611 V1.2_23075dbb.png||height="19" width="19"]] Switch the bound Cloud SCADA projects (The cloud SCADA projects bound in current device and cross-device).
304
305 [[image:Wecon V-BOX R Series User Manual 240611 V1.2_1ced925.png||height="19" width="19"]] Edit the current cloud SCADA (jump to the Cloud SCADA edit page)
306
307
308 **(4) Basic information**
309
310 Include: "Basic information, status push, register information, version information" for the device.
311
312 [[image:Wecon V-BOX R Series User Manual 240611 V1.2_b1d4b150.png||height="330" width="638"]]
313
314 ●**Device name:** Mainly used to distinguish various devices.
315
316 ●**Online status**: Use the refresh function to refresh the online status of the device.
317
318 ●**Machine code:** Each device has a unique and independent machine code.
319
320 ●**Map Information:** The latitude and longitude information of the device, click “Location” to view the geographical location and modify the location information.
321
322 ●**Located with:**
323
324 ① Use device base station positioning.        
325
326 ②Use manual positioning.
327
328 **Note: After modifying the basic information of the device, you need to click Save below to save successfully. If the save is not successful, please click Force Sync.**
329
330
331 == **4 Pass-through of device** ==
332
333 **Note: The pass-through operation steps of V-NET/V-IEC are for reference only.**
334
335 Pass-through function: The pass-through function allows applications on the computer to increase maintenance value through RE devices, remote pass-through devices, download projects, etc.
336
337 [[image:Wecon V-BOX R Series User Manual 240611 V1.2_1c4453d8.png||height="338" width="638"]]
338
339 Device status description table is as follows:
340
341 |(% style="width:82px" %)**Color**|(% style="width:248px" %)**Color Value (HEX)**|**Status**|**Description**
342 |(% style="width:82px" %)[[image:1723449592784-532.png]]|(% style="width:248px" %)#18E600|Online|Pass-through available
343 |(% style="width:82px" %)[[image:1723449624928-809.png]]|(% style="width:248px" %)#B5C1D8|Offline|Pass-through is not allowed
344 |(% style="width:82px" %)[[image:1723449706265-533.png]]|(% style="width:248px" %)#1C9BFD|Pass-through connecting|In pass-through
345 |(% style="width:82px" %)[[image:1723449737329-134.png||height="28" width="31"]]|(% style="width:248px" %)#005CFF|VPN connecting|In pass-through
346 |(% style="width:82px" %)[[image:1723449765210-888.png]]|(% style="width:248px" %)#FD8B09|VPN pass-through is reconnecting|Pass-through reconnecting due to network and other reasons
347 |(% style="width:82px" %)[[image:1723449785743-305.png||height="28" width="32"]]|(% style="width:248px" %)#2C405E|VPN pass-through is ending|The end of pass-through due to [End pass-through]
348 |(% style="width:82px" %)[[image:1723449827434-119.png]]|(% style="width:248px" %)#109A00|Download is ready.|Download channel is ready. (Download can be executed.)
349 |(% style="width:82px" %)[[image:1723449809049-353.png]]|(% style="width:248px" %)#009577|Download|In download
350
351 **Pass-through precautions:**
352
353 ● The web cannot use the pass-through function for the time being, and it needs to be in the PC client to change the location.
354
355 ● When the device is offline, “Start pass-through” cannot be clicked.
356
357 ● When the device firmware version is too low, “Start pass-through” cannot be clicked.
358
359 ● The current user does not have pass-through rights on this device or this device is shared by others, and “Start pass-through” cannot be clicked.
360
361 ● When the current user has a device in pass-through, “Start pass-through” cannot be clicked.
362
363
364 === **4.1 Device pass-through download (RE)** ===
365
366 The pass-through function allows applications on the computer to download projects to RE device remotely pass-through through Ethernet.
367
368 **Steps:**
369
370 ① Click [[image:Wecon V-BOX R Series User Manual 240611 V1.2_f1b46bca.png||height="16" width="17"]] to enter the pass-through interface.
371
372 ② Select the device that needs pass-through, and ensure that the device is online.
373
374 ③ Click "Browse" to automatically detect the installed download tools on this machine. The table shows the versions and locations of all installed download tools. (HMI software should be installed in the computer to ensure that HMIEditor and download tools exist at the same time).
375
376 ④ Select any HMI download tool configuration in the table, and confirm the selected HMIEditor software through the folder location and corresponding version information.
377
378 ⑤ Pass-through is ready → [Start pass-through].
379
380 ●Click "Start pass-through" to conduct pass-through according to the specified download tools and selected devices.
381
382 ●Click [End pass-through] to end pass-through.
383
384 ⑥ After pass-through is successful, pop up the download tool box, select [PC->HMI], select the compiled .wmt3 file, and download the program.
385
386 [[image:Wecon V-BOX R Series User Manual 240611 V1.2_221b5f45.png||height="338" width="638"]]
387
388 === **4.2 Common serial port pass-through (PLC)** ===
389
390 Based on the normal communication between RE device and PLC or other device, PLC is connected according to the generated virtual serial port, allowing the PLC software on the computer to communicate and connect with the PLC, and completing the functions of uploading/downloading PLC programs and monitoring PLC programs.
391
392 **Steps:**
393
394 ① Virtual serial port settings: Click** [Settings]** →**[Virtual Serial Port]**→**[Enable Virtual Serial Port] **→**[Select Serial Port]**. Pay attention to the serial port, please do not reuse it. (When the COM port is changed, if a PLC or other software is connecting to the original COM port, it will be disconnected.)
395
396 [[image:Wecon V-BOX R Series User Manual 240611 V1.2_54a850e2.png||height="136" width="639"]]
397
398 ② Remote download configuration: Click [PLC pass-through ][[image:Wecon V-BOX R Series User Manual 240611 V1.2_cfc415e2.png||height="14" width="15"]] →Select the device that requires pass-through→[New/Edit]→[New Template] Configure pass-through parameters: [Name], [Communication Port], [Connection Method], [Baud Rate], [Stop Bit], [Data Bit], [Check Bit], the configured parameters need to be consistent with the PLC serial port parameters →[OK]→Prompt "Add successfully!"→[OK].
399
400 [[image:Wecon V-BOX R Series User Manual 240611 V1.2_353545eb.png||height="339" width="638"]]
401
402 ③ Pass-through steps: On the pass-through interface, click [Start pass-through]→after successful pass-through, it will prompt "pass-through succeeded"→[OK].
403
404 [[image:Wecon V-BOX R Series User Manual 240611 V1.2_5b5ad7dd.png||height="339" width="638"]]
405
406 ④ After the pass-through is successful, the indicator light of the corresponding RE device on the PC will turn blue, and the [current status] will become pass-through, indicating that the device is in the "pass-through" status.
407
408 ✎**Note:** Do not click [End pass-through], otherwise you will exit the pass-through function.
409
410
411
412 ⑤End pass-through: When the PLC software completes the remote operation, select [End pass-through]→Prompt "End pass-through successfully"→[OK], at this time the device will automatically restart. After the restart is completed, the working status before pass-through will be restored.
413
414 [[image:Wecon V-BOX R Series User Manual 240611 V1.2_c6ec3cf0.png||height="337" width="638"]]
415
416 **Pass-through Precautions:**
417
418 ① In the process of PLC software remote access, the pass-through serial port of the RE device needs to maintain a normal communication state, and the network state needs to remain stable.
419
420 ② When the device is in the pass-through, COM indicator light will be in the off status. When the device ends the pass-through, it will automatically restart.
421
422 ③ The parameters of the PLC connection need to be consistent with the parameters generated by the virtual serial port.
423
424 ④ It is necessary to ensure that the PLC serial port of pass-through can support the upload/download function, otherwise the remote pass-through function cannot be realized.
425
426 === **4.3 VPN pass-through (PLC)** ===
427
428 **VPN pass-through:** The pass-through function allows the application program on the computer to directly control the PLC device through the RE device, upload/download PLC programs, monitor PLC programs or other configuration information, etc.
429
430 **Steps:**
431
432 ① Click [VPN pass-through] [[image:1723450415577-521.png]]→Select the device that requires pass-through →[Local pass-through IP]→[Automatic acquisition/manual setting]→[Manual setting] 192.168.40.23 (Manual IP setting needs to ensure that it is on the same network segment as the RE device and device IP)→[Start pass-through]→Prompt "Pass-through succeeded"→[OK].
433
434 [[image:Wecon V-BOX R Series User Manual 240611 V1.2_a4500d0f.png||height="335" width="638"]]
435
436 ② After pass-through is successful, the indicator light of the corresponding RE device on the PC will turn yellow, and [current status] will become in the VPN pass-through, indicating that the device is in the "pass-through" status. (**Note:** You cannot click [End pass-through], otherwise you will exit the pass-through.)
437
438 ③ After the pass-through is successful, a virtual network card will be generated. You can check whether the IP is generated through the network card of the computer, as shown below.
439
440 [[image:Wecon V-BOX R Series User Manual 240611 V1.2_a53a8121.png||height="336" width="638"]]
441
442 ④ When PLC software completes the remote operation, select [End pass-through]→Prompt "End VPN pass through successfully"→[OK], at this time the device will automatically restart, and after the restart is completed, the working status before pass-through will be restored.
443
444 [[image:Wecon V-BOX R Series User Manual 240611 V1.2_40416c98.png||height="336" width="638"]]
445
446 **Pass-through precautions:**
447
448 ① The Ethernet port IP of RE device, the IP used by the VPN pass-through, and the IP of the PLC must be kept in the same network segment without conflict.
449
450 ② The IP connected to the PLC needs to be consistent with the IP of the PLC itself.
451
452 ③ When the device ends the pass-through function, RE device will automatically restart.
453
454 ④ If the VPN pass-through is unsuccessful, please refer to the "Frequently Asked Questions of Wecon VPN pass-through Tools" for troubleshooting.
455
456 The file path is as follows:
457
458 [[https:~~/~~/www.we-con.com.cn/uploads/image/20210811/611392100b634.pdf>>https://www.we-con.com.cn/uploads/image/20210811/611392100b634.pdf]]
459
460 == 5 Resumable upload ==
461
462 3000ig/8000ig HMI and RE/RH,E/H V-BOX can support  a function for resumable upload. The function is to save lost data when the device is offline and upload lost data to Cloud when the device is online again.
463
464 The following table shows the maximum number of the resumable data and the biggest file size of the resumable data:
465
466 |= |=RE/RH|=3000ig/8000ig HMI|=E/H V-BOX
467 |=data|100,000|100,000|2,000
468 |=file size|2M|2M|N/A
469
470 (% class="box infomessage" %)
471 (((
472 Note:
473
474 1.The function don't configure by manual.
475
476 2.When the device is online again, There is a keep-alive interval for about 30s. So data will be lost during the time.
477 )))
478
479 == 6 Remote Background ==
480
481 R series box doesn’t have the actual screen, so a new remote page is designed for background setting if user want to change some background parameters.
482
483 (% class="box infomessage" %)
484 (((
485 Note: HMI of V3.0 version also supports this function.
486 )))
487
488 === Enter remote background ===
489
490
491 Keep R series/HMI and pc in the same Lan. Input "IP:9091" in pc webpage.
492
493 (% style="text-align:center" %)
494 [[image:TYyajNRreA.png]]
495
496 There will be a User login screen and input Account and Password.
497
498 (% style="text-align:center" %)
499 [[image:zt10uj9hHA.png]]
500
501 (% class="box infomessage" %)
502 (((
503 Note: The default Account is "admin". The default Password is "888888".
504 )))
505
506 === Modify account and password ===
507
508 Project Settings → Security→ LAN Monitoring Security→ OK → Compile and Download the project
509
510 (% style="text-align:center" %)
511 [[image:rDTHQo0uzs.png]]
512
513 == 7 Centralized Monitor ==
514
515 In HMI V3.0 version, there will be a Device management tool for centralized monitoring Local and Cloud device. When HMIs and PC are in the same LAN, they can be selected for centralized monitor.
516
517 (% class="box infomessage" %)
518 (((
519 Note: Centralized Monitor can not be accomplished by connection that HMIs are connected to PC with USB.
520 )))
521
522 === Local Device ===
523
524 Download → choose monitored HMIs
525
526 (% style="text-align:center" %)
527 [[image:1yeIHMWarO.png]]
528
529 === Cloud Device ===
530
531 Cloud Linker →log in → select the server in configuration→ log in V-net Client account
532
533 (% style="text-align:center" %)
534 [[image:DTQ10E5Cv6.png]]
535
536 (% style="text-align:center" %)
537 [[image:IPJDUDCzD4.png]]
538
539 After logging in the account, select monitored HMIs.
540
541 (% style="text-align:center" %)
542 [[image:y6AlyJtG24.png]]
543
544 In Centralized monitor screen, selected HMI project will be display here. What's more, these projects can be operated in the screen.
545
546 (% style="text-align:center" %)
547 [[image:MnqsQgF2Cm.png]]
548
549