Changes for page 03 Software

Last modified by Jim on 2025/01/10 15:20

From version 40.1
edited by Devin Chen
on 2024/10/22 17:42
Change comment: There is no comment for this version
To version 41.1
edited by Jim
on 2025/01/10 15:20
Change comment: There is no comment for this version

Summary

Details

Page properties
Author
... ... @@ -1,1 +1,1 @@
1 -XWiki.DevinChen
1 +XWiki.Jim
Content
... ... @@ -1,49 +1,23 @@
1 -|=(% style="width: 179px;" %)**Software**|=(% style="width: 126px;" %)Version|=(% style="width: 119px;" %)Download|=(% style="width: 652px;" %)Description
2 -|=(% style="width: 179px;" %)**PLC Editor2**|(% style="width:126px" %)2.4.34(20240926)|(% style="width:119px" %)[[Link>>https://ftp.we-con.com.cn/Download/WIKI/LX5V%20PLC/Software/Wecon%20PLC%20Editor2%20setup%202.4.34.24092602.zip]]|(% style="width:652px" %)(((
1 +|=**Software**|=Version|=Download|=Description
2 +|=**PLC Editor2**|2.4.41(20241220)|[[Link>>url:https://ftp.we-con.com.cn/Download/WIKI/LX6V%20PLC/Software/Wecon%20PLC%20Editor2%20setup%202.4.41.24122004.zip]]|(((
3 3  Software Update:
4 4  
5 -* Fixed issue where the range and description of the K parameter in the SOCTCP instruction were inconsistent.
6 -* Fixed issue where the compiler did not report an error when a T register was called twice after using the TON or TOF instruction.
7 -* Fixed issue where the software would freeze when deleting the last section of a program after copying a 3V program to a 5V PLC.
8 -* Fixed the issue where the PLC software would lag during online monitoring of the module
9 -* Fixed issue where the 6V project took a long time to close after switching from monitoring to editing mode.
10 -)))
5 +* Added LX6S series
11 11  
12 -
13 -|=(% style="width: 179px;" %)**Software**|=(% style="width: 126px;" %)Version|=(% style="width: 119px;" %)Download|=(% style="width: 652px;" %)Description
14 -|=(% style="width: 179px;" %)**PLC Editor2**|(% style="width:126px" %)2.4.23(20240702)|(% style="width:119px" %)[[Link>>https://ftp.we-con.com.cn/Download/WIKI/LX6V%20PLC/Software/Wecon%20PLC%20Editor2%20setup%202.4.23.24070201.zip]]|(% style="width:652px" %)(((
15 -Software Update:
16 -
17 -* Fixed Ethernet search device issue;
18 -* Fixed the issue that the imported XML file would crash;
19 -
20 20  New features
21 21  
22 -* Added 6V USB download function
23 -* Added FB/FC import and export function
24 -* Cancel EN/ENO of function block
25 -* Added EtherCAT distributed clock function
26 -* Added EtherCAT & Expansion module scanning function
27 -* LX5 series add LX5V-4TC, LX5V-2TC2ADV BD module
9 +* Added axis online debug function.
10 +* Optimize variable creation
11 +* Other bugs fixed.
28 28  )))
29 29  
30 30  |=(% style="width: 179px;" %)**Software**|=(% style="width: 126px;" %)Version|=(% style="width: 119px;" %)Download|=(% style="width: 652px;" %)Description
31 -|=(% style="width: 179px;" %)**PLC Editor2**|(% style="width:126px" %)2.3.218(20240325)|(% style="width:119px" %)[[Link>>https://ftp.we-con.com.cn/Download/WIKI/LX5V%20PLC/Software/Wecon%20PLC%20Editor2%20setup-240325.exe]]|(% style="width:652px" %)(((
15 +|=(% style="width: 179px;" %)**PLC Editor2**|(% style="width:126px" %)2.4.34(20240926)|(% style="width:119px" %)[[Link>>https://ftp.we-con.com.cn/Download/WIKI/LX5V%20PLC/Software/Wecon%20PLC%20Editor2%20setup%202.4.34.24092602.zip]]|(% style="width:652px" %)(((
32 32  Software Update:
33 33  
34 -* Added axis debug function;
35 -* Added variable copy and paste function;
36 -
37 -New features
38 -
39 -* Support MC_TOUCHPROBE
40 -* Add three EtherCAT related FB:
41 -** ETC_READPARAMETER_COE
42 -** ETC_WRITEPARAMETER_COE
43 -** IODVETHERCAT
44 -* Add four built-in FC:
45 -** ROUND
46 -** ROUNDUP
47 -** CEIL
48 -** FLOOR
18 +* Fixed issue where the range and description of the K parameter in the SOCTCP instruction were inconsistent.
19 +* Fixed issue where the compiler did not report an error when a T register was called twice after using the TON or TOF instruction.
20 +* Fixed issue where the software would freeze when deleting the last section of a program after copying a 3V program to a 5V PLC.
21 +* Fixed the issue where the PLC software would lag during online monitoring of the module
22 +* Fixed issue where the 6V project took a long time to close after switching from monitoring to editing mode.
49 49  )))